Six Sigma and Lean deployment led by 20+ years of hands-on manufacturing experience, that cuts cost, waste and variation — with the data to prove it, not just activity.
Last updated: 28 September 2026
Six Sigma and Lean are complementary approaches to reducing cost, waste and variation: Lean strips out non-value-adding activity through tools like 5S and value stream mapping, while Six Sigma's DMAIC framework (Define, Measure, Analyse, Improve, Control) uses data and statistical process control to find and permanently fix the causes of variation and defects.
This service is led by Danish Akhtar, a Lean Six Sigma with over 20 years of hands-on quality engineering experience — DMAIC applied to real automotive, aerospace and defence manufacturing environments, not a classroom exercise. See the full background.
You know cost, waste or variation is a problem but need a structured, data-led way to fix it.
You want your own people trained and capable of running improvement projects, not permanently dependent on consultants.
Structured, data-led improvement projects scoped around your highest-cost problems.
Workplace organisation and waste elimination that sticks, not a one-off tidy-up.
Control charts and capability studies (Cp/Cpk, Pp/Ppk) that show whether a process can actually meet specification.
Mapping the current and future state of a process to identify where waste and delay really sit.
Green Belt and Yellow Belt training via our training programme, with live coaching on real projects.
Focused, time-boxed improvement events targeting a specific process or problem.
We scope the problem, agree the business case and baseline current performance with real data.
We identify the root causes of variation, waste or defects using statistical and Lean tools.
We design, trial and implement improvements targeted at the confirmed root causes.
We put controls in place — SPC, standard work, training — so the improvement sticks after we leave.
How the Six Sigma DMAIC methodology, Kaizen events and ISO's continual improvement requirement relate to each other — written as an accurate reference, not just marketing copy.
DMAIC (Define, Measure, Analyse, Improve, Control) is the core Six Sigma project methodology: a five-phase, data-led cycle for finding and permanently removing the causes of cost, waste, defects or variation in a process. Unlike a single fix, DMAIC's Control phase is designed to feed learning into the next improvement cycle.
| Phase | Typical tools | Output |
|---|---|---|
| Define | Project charter, SIPOC, voice of the customer | Agreed problem & business case |
| Measure | Data collection plan, MSA, baseline Cpk | Verified baseline data |
| Analyse | Fishbone, 5-Why, hypothesis testing | Confirmed root causes |
| Improve | Design of experiments (DOE), piloting | Validated improvement |
| Control | Control plan, SPC, standard work | Sustained, monitored gain |
Kaizen means "change for the better" — continuous, incremental improvement, most visibly delivered through short, structured Kaizen events (sometimes called a "Kaizen blitz") that bring together the people who actually do the work to improve a tightly scoped process over a fixed timeframe, typically three to five days, using repeated PDCA cycles.
Define the target process, agree the goal, and measure current performance.
Observe the process directly, identify waste and root causes with the team.
Trial changes directly on the process, adjusting as the team learns.
Check results against the baseline and fine-tune the change.
Lock in the new way of working and report results and next steps.
In ISO 9001, ISO 14001 and ISO 45001 (all Clause 10.3), continual improvement is the ongoing, organisation-wide requirement to improve the suitability, adequacy and effectiveness of the management system — distinct from a single Kaizen event or DMAIC project, which are two of the tools an organisation can use to deliver it. Inputs typically include management review outputs, internal and external audit findings, and closed corrective actions.
Projects are led by Danish Akhtar, a Lean Six Sigma with over 20 years of hands-on quality engineering experience across automotive, aerospace and defence manufacturing — DMAIC applied to real production lines and supply chains, not classroom theory.
No — Six Sigma and Lean can be applied to any process, certified or not. That said, if you do hold ISO 9001 or IATF 16949, improvement projects and SPC data can feed directly into your existing management system.
The core tools (APQP, PPAP, FMEA, MSA, SPC) are specific to automotive product launch and control. Six Sigma and Lean are broader improvement methodologies that can be applied to any process, in or out of automotive — though SPC is shared between the two.
A focused DMAIC project usually runs 8 to 16 weeks depending on complexity and data availability; a Kaizen event can be as short as a few days.
We quote a fixed price per project or a retainer for ongoing improvement support, agreed after a free scoping call based on the scale of savings targeted.
Most of our clients need more than one of these — here's what tends to go together.
APQP, PPAP, FMEA, MSA and SPC implemented and coached until your team owns them.
Structured root cause analysis that closes issues out for good — 8D, 5-Why, CAPA.
Quality management certification, gap analysis and 2026 transition support.
Your part-time, outsourced QHSE manager — keeping the system live between full-time hires.
Standards & methodologies we work to
Sectors we work in
Tell us about the process or problem and we'll scope a project with a clear business case.
Talk to a consultant →