Where Systems Enable Performance · Quality · Health & Safety · Environment

+44 7767 982505·info@controledge.co.uk

Home / Services / Risk Assessment & RAMS
Health & Safety

Risk Assessment & RAMS Services

Practical risk assessments and method statements (RAMS) your teams can actually follow on-site — built to meet your legal duties, not just fill a folder.

Wales & the South West — Cardiff, Newport, Swansea, Bristol the Midlands — Birmingham, Coventry, the automotive manufacturing belt London & the South East — London, Essex, Kent the North of England — Manchester, Leeds, Sheffield
Why proper risk assessment matters

Risk assessment as a working tool, not a filing exercise

Under the Management of Health and Safety at Work Regulations 1999, every employer must carry out a suitable and sufficient risk assessment of the risks to employees and others affected by their work. For higher-risk or project-based work — particularly in construction, manufacturing and contracting — a risk assessment method statement (RAMS) sets out not just the hazards, but exactly how the work will be carried out safely.

Too many risk assessments and RAMS are written once, filed, and never looked at again — or copied from a generic template that doesn't match what actually happens on site. We write them to be used: clear enough for the person doing the job to follow, and specific enough to hold up under scrutiny after an incident or during a client or principal contractor audit.

Who it's for

Who this service is for

Manufacturing & engineering businesses

You need up-to-date task and workplace risk assessments covering machinery, manual handling, COSHH and site-specific hazards.

  • Task & workplace risk assessments
  • Safe systems of work
  • COSHH-aware assessments

Construction, contracting & project work

You need RAMS for specific jobs or sites, often to satisfy a principal contractor or client before work can start.

  • Project-specific method statements
  • Dynamic risk assessment guidance
  • Review before submission to clients/PCs
What's included

What's included

Task & workplace risk assessments

Assessments covering your actual processes, equipment and site conditions — not a generic library.

Method statements (RAMS)

Clear, step-by-step method statements that match how the work will really be carried out.

Safe systems of work

Documented safe systems for higher-risk or non-routine tasks, linked to training and supervision.

COSHH-aware assessments

Risk assessments that correctly account for hazardous substances in use on site.

Review & sign-off support

Review of assessments and RAMS before submission to a client, principal contractor or auditor.

Integration with ISO 45001

Risk assessments built to slot directly into an ISO 45001 management system, if you hold or want certification.

Our process

How we work

1

Site or task review

We walk the process or site with you (remotely or in person) to understand the real hazards involved.

2

Draft the assessment/RAMS

We draft the risk assessment or method statement in plain language your team will actually read.

3

Review with your team

We review the draft with supervisors or operatives to check it matches reality before sign-off.

4

Issue, train & review

We issue the final documents, brief the team if needed, and set a review date so they stay current.

Why Control Edge

Why work with Control Edge on risk assessment

Common questions

Risk assessment questions, answered

Is a risk assessment a legal requirement?

Yes. UK law requires every employer to carry out suitable and sufficient risk assessments under the Management of Health and Safety at Work Regulations 1999, and to record the significant findings if you have five or more employees.

How often should risk assessments be reviewed?

As a minimum, whenever the work, equipment, substances or personnel change, or after an incident or near miss — and periodically even if nothing has obviously changed, typically annually for stable processes.

What's the difference between a risk assessment and RAMS?

A risk assessment identifies hazards and evaluates the risk; a RAMS (risk assessment method statement) goes further by also specifying, step by step, exactly how a specific job or task will be carried out safely — commonly required for construction and project-based work.

Can you produce RAMS for a specific project quickly?

Yes — turnaround depends on complexity, but we regularly produce project-specific RAMS to tight client or principal contractor deadlines.

What does this service cost?

We quote a fixed price based on the number and complexity of assessments or RAMS needed, agreed after a free scoping call.

Related services

Explore related services

Most of our clients need more than one of these — here's what tends to go together.

Need risk assessments or RAMS you can actually rely on?

Tell us about your site, process or project and we'll quote a fixed price to get you covered.

Talk to a consultant →